Rantau Panjang–Sungai Golok Bridge
| Field | Value |
|---|---|
| bridge_name | Rantau Panjang–Sungai Golok Bridge |
| official_name | Rantau Panjang–Sungai Golok Bridge |
| native_name | Jambatan Rantau Panjang–Sungai Golok |
| สะพานโก–ลก | |
| locale | Rantau Panjang, Kelantan |
| carries | Motor vehicles |
| crosses | Kolok River, Malaysia-Thailand Border |
| mainspan | 30.48 m, each of 3 spans |
| length | 109.73 m |
| width | 11.58 m |
| open | 21 May 1973 |
| design | Box girder bridge |
| builder | Chang Loon Construction Co., Ltd and Jabatan Kerja Raya (JKR) |
สะพานโก–ลก
Rantau Panjang–Sungai Golok Bridge (, ), popularly called the "Harmony Bridge" (), is a road bridge crossing Kolok River () of the Malaysia–Thailand border, connecting Rantau Panjang town in Kelantan, Malaysia, with Su-ngai Kolok town in Narathiwat, Narathiwat Province, Thailand. It spans to the south of the cross-border railway bridge Harmony-Bridge nearby. The bridge is a part of Asian highway network AH18, including Thailand Route 4056 and Federal Route 3. It was built by the governments of both countries, and was officially opened on 21 May 1973 by both Malaysian Prime Minister Tun Abdul Razak bin Haji Dato' Hussein Al-Haj and Thai Prime Minister Field Marshal Thanom Kittikachorn.
Design
The bridge is a beam bridge with box girders. The main part includes three spans, using prestressed concrete, with each length of 30.48 metres (100 ft). Each end is connected to a ferroconcrete span, with length of 9.14 m (30 ft). It is overall 109.73 m (360 ft) long, with 7.32 m (24 ft) wide road surface and 2.13 m (7 ft) wide walkway each side.
Construction
Construction was done by Chang Loon Construction Co., Ltd., a Malaysian contractor which won the bidding-held meanwhile in both countries on 25 September 1970. The ask price was M$630,000 or 4,500,000 baht. A contract was signed on 16 December 1970. Both governments paid half each. Since the construction was finished on 20 March 1973, after the deadline of 15 June 1972, the company had to pay overtime penalty M$200 or 1,400 baht a day, totalling M$36,000 or 252,000 baht.
References
References
- "Friendship Bridge Linking Thailand and Malaysia". Thai Public Relations Department.
- {{in lang. th [http://www.doh.go.th/dohweb/international/develop.html Department of Highways, Thailand] {{webarchive. link. (10 March 2009)
- (26 April 2015). "Construction of additional bridge between Malaysia, Thailand to start next year". [[Astro Awani]].
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Rantau Panjang–Sungai Golok Bridge — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report