McKalla station


McKalla
McKalla station platforms
Austin, Texas, United States
.mw-parser-output .geo-default,.mw-parser-output .geo-dms,.mw-parser-output .geo-dec{display:inline}.mw-parser-output .geo-nondefault,.mw-parser-output .geo-multi-punct,.mw-parser-output .geo-inline-hidden{display:none}.mw-parser-output .longitude,.mw-parser-output .latitude{white-space:nowrap}30°23′16″N 97°43′03″W / 30.3878°N 97.7176°W / 30.3878; -97.7176
CapMetro
2 side platforms
2
Yes
February 24, 2024
.mw-parser-output .adjacent-stations{max-width:50em;margin:0.5em auto;font-size:95%;clear:both}.mw-parser-output .infobox .adjacent-stations{font-size:100%}.mw-parser-output .adjacent-stations .isA{font-size:90%;font-style:italic}.mw-parser-output .adjacent-stations .smA{font-size:90%}.mw-parser-output .infobox .adjacent-stations .isA,.mw-parser-output .infobox .adjacent-stations .smA{font-size:96.6%}.mw-parser-output .adjacent-stations .hcA{width:30%;vertical-align:middle}.mw-parser-output .adjacent-stations .hmA,.mw-parser-output .adjacent-stations .hmA>a:last-child{vertical-align:middle}.mw-parser-output .adjacent-stations .bcA{text-align:center;vertical-align:middle}.mw-parser-output .adjacent-stations .bbA{text-align:center;width:8px;min-width:8px}.mw-parser-output .adjacent-stations-noclear{clear:none}

Preceding station

CapMetro Rail

Following station

Kramertoward Leander

Red Line

Crestviewtoward Downtown | Kramertoward Leander | | Red Line | | Crestviewtoward Downtown | | Kramertoward Leander | | Red Line | | Crestviewtoward Downtown | | | | | | | | | | | | | | | | | Preceding station

CapMetro Rail

Following station

North Burnet/Uptowntoward Leander

Red Line

Crestviewtoward Downtown | North Burnet/Uptowntoward Leander | | Red Line | | Crestviewtoward Downtown | | North Burnet/Uptowntoward Leander | | Red Line | | Crestviewtoward Downtown | | | | | | | | | | | | | | | | | Location | | | | | | | | | | | | |

McKalla station is a CapMetro Rail hybrid rail station in Austin, Texas, United States. The station was built to provide convenient access to Q2 Stadium. Ground broke on construction on July 18, 2022, and the new station opened on February 24, 2024, coinciding with the first home match of Austin FC's 2024 season. The station opened at 10:00 a.m. with a ribbon-cutting ceremony, with rides being free. Construction costs were estimated at $13 million, with total costs estimated at $60 million. The station is double-tracked, includes two regular service side platforms, with the southbound platform serving both northbound and southbound trains during special events and a gated walkway to the east side of the tracks. Soon after opening of the new station, along with North Burnet/Uptown station to the north, nearby Kramer station is expected to be closed. The station was designed and constructed by Stacy Witbeck. Finishing touches for the station are expected to be completed in April or May 2024.

Want to explore this topic further?

Ask Mako anything about McKalla station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report