Skip to content
Surf Wiki
Save to docs
general/bakerloo-line-stations

From Surf Wiki (app.surf) — the open knowledge base

Elephant & Castle tube station

London Underground station

Elephant & Castle tube station

Summary

London Underground station

FieldValue
nameElephant & Castle
managerLondon Underground
ownerLondon Underground
localeElephant and Castle, Newington
boroughLondon Borough of Southwark
platforms4
fare_zone1
fare_zone_12
image_nameFile:Elephant and Castle Bakerloo Line station.jpg
image_altThe Bakerloo line entrance, with its classic deep-red faience style arches, with the modern glass-sided and glass-topped flat-roofed extension abutting the original western elevation.
captionThe Bakerloo line entrance, showing its design features with shops and the entrance to the far right
coordinates
map_typeCentral London
label_positionleft
years1
years25 August 1906
events1Opened (C&SLR)
events2Opened (BS&WR)
<!--tubeexits0618.325
tubeexits0717.132
tubeexits0818.540
tubeexits0918.33--
accessyes
access_note(Northern line southbound only)
interchangeElephant & Castle

the London Underground station

Elephant & Castle is a London Underground station in the London Borough of Southwark in Central London. It is on the Bank branch of the Northern line, between Borough and Kennington stations. It is also the southern terminus of the Bakerloo line and the next station towards north is Lambeth North. The station is in both London fare zone 1 and zone 2. The Northern line station was opened in 1890 by the City and South London Railway (C&SLR) while the Bakerloo line station was opened sixteen years later by the Baker Street and Waterloo Railway (BS&WR). There is an out-of-station interchange with the nearby Elephant & Castle National Rail station.

A girl born at the station in 1924 was the first baby to be born on the Underground network. The Bakerloo line building remains much as originally constructed and is a typical Leslie Green structure. The Northern line building was designed by Thomas Phillips Figgis, and was rebuilt several times until the current structure opened in 2003. Transport for London (TfL) is currently planning a major upgrade to the station. A Bakerloo line extension south to Camberwell was planned and approved in 1931 but construction never started. Similar proposals have been revived on several occasions; in 2014 TfL ran a consultation on an extension to Hayes and Beckenham Junction, which is still under consideration.

The station today

Geography

The statue depicting the name 'Elephant & Castle' next to the Northern line entrance (Now at Elephant Park)

Elephant & Castle is located in the Elephant and Castle area of Newington in the London Borough of Southwark in central London. The station is in both London fare zone 1 and 2|group=note}} The northern building provides the most direct access to the Bakerloo line, while the southern one is linked more directly to the Northern line.

Station buildings

Access to the more northerly (Bakerloo) part of the station is via the original building, while the exit is via a new extension next to Skipton House. Between the entrance and two shops is the entrance to South London House, an office block above the station. The BS&WR station building remains much as originally constructed and is a typical Leslie Green structure. The main alteration is a modern glass-sided and glass-topped flat-roofed extension abutting the original western elevation, giving access to three of the six arches. These arches, in a classic deep-red faience style, formed the original perimeter: two are infilled with street-facing shops. As the station also functions as a drivers' depot, London Underground uses the offices above the station for administration and drivers' accommodation.

The C&SLR station was designed by Thomas Phillips Figgis It was partially rebuilt in the 1920s when the C&SLR tunnels were modernised, and was rebuilt during the construction of the Elephant & Castle shopping centre and roundabout in the 1960s. This Northern line ticket hall was rebuilt at the start of the 21st century, reopening on 12 December 2003 following 2 years of upgrade work.

Neither the Northern line nor Bakerloo line ticket halls have escalators. To get from either ticket hall to the platforms it is necessary to use the lifts or spiral stairs. The southern (Northern line) building has lifts from street level down to the level of the southbound Northern line platform, the only step-free platform at the station. From inside the station, the northern exit is labelled "London South Bank University" and emerges at the southern tip of the triangular campus. The southern exit is labelled "Shopping Centre" and also leads to the National Rail station where there is an out-of-station interchange, allowing Oyster card and contactless payment card users to interchange while paying a single fare for their journey.

Heritage feature and refurbishment

The multi-coloured platform tiles on the Northern line were reconstructed in the 1920s in conjunction with an extension to Morden station. The original maroon and cream tiling on the Bakerloo line platforms has been covered over.

Services

Bakerloo line

Elephant & Castle station is the southern terminus of the Bakerloo line and the next station is Lambeth North to the north. Trains heading northbound terminate at either Queen's Park, Stonebridge Park or Harrow & Wealdstone.

The typical service pattern in trains per hour (tph) is:

  • 4tph to Harrow & Wealdstone
  • 4tph to Stonebridge Park
  • 8tph to Queen's Park

Northern line

A Northern line train at the southbound platform looking south.

On the Bank or City branch of the Northern line, Elephant & Castle station is between Borough to the north and Kennington to the south.

The typical off-peak service (as of November 2025) in trains per hour (tph) is:

  • 2 tph to Mill Hill East (northbound)
  • 8 tph to High Barnet (northbound)
  • 10 tph to Edgware (northbound)
  • 20 tph to Morden (southbound)

Connections

A large number of London Buses routes serve the station day and night, stopping outside the station at either Newington Butts (Northern line entrance) or London Road (Bakerloo line entrance).

History

Northern line

Between 1883 and 1886, a route was planned by the City and South London Railway (C&SLR), then known as the City of London & Southwark Subway (CL&SS), from King William Street via Elephant & Castle to Stockwell and Clapham Common. The entire route was approved on 25 July 1890{{refn|The act was published on 25 July 1890 as the City and South London Railway Act, 1890. At the same time, the company's name was changed from CL&SS to C&SLR.

In November 1891, the C&SLR recognised the deficiencies of the section between Borough station and King William Street. A new route was chosen with a different pair of tunnels, avoiding this section. Near Borough, the new tunnels would branch off to London Bridge to form an interchange with the mainline station and then north through the City of London to Angel. following a delay. The Act also incorporated another bill of 1893 to grant more time to build the southern extension to Clapham. The new route and the first section of the northern extension from Borough to Moorgate opened on 25 February 1900, and the King William Street diversion was closed. The southern extension to Clapham Common opened on 3 June 1900. Work continued on the rest of the northern extension and it opened on 17 November 1901.

In 1912, the C&SLR submitted another bill to increase its capacity by enlarging its tunnels to the larger diameter used for the tunnels of the more recently built railways to allow larger, more modern rolling stock to be used. Together, the works proposed in these bills would enable the Charing Cross, Euston and Hampstead Railway (CCE&HR)'s trains to run over the C&SLR's route and vice versa, effectively combining the two separate railways. Tunnel enlargement works only restarted after World War I when an extension of time was granted in February 1919. The Moorgate to Clapham Common section reopened on 1 December 1924, approximately eight months after the rest of the line.

Route diagram which shows the original route of the Bakerloo line from Paddington to Elephant & Castle via Baker Street and Waterloo.

Bakerloo line

In November 1891, a private bill was presented to Parliament for the construction of the Baker Street and Waterloo Railway (BS&WR). The railway was planned to run entirely underground from Marylebone to Elephant & Castle via Baker Street and Waterloo and was approved in 1900. Construction commenced in August 1898 under the direction of Sir Benjamin Baker, W.R. Galbraith and R.F. Church with building work by Perry & Company of Tredegar Works, Bow. Test trains began running in 1905. The first section of the BS&WR was between Baker Street and Lambeth North. The BS&WR station opened on 5 August 1906, almost five months after the rest of the line.

Incidents

On the morning of 27 November 1923, a slight misjudgement at the end of the tunnel enlargement work left the tunnel unstable near Borough. A collapse on the same day, caused when a train hit temporary shoring near Elephant & Castle, filled the tunnel with wet gravel. Later a gas main exploded, causing a water main to break and leaving a water-filled crater in the middle of the street. The line was briefly split in two, but was completely closed on 28 November 1923.

A girl born at the station on 13 May 1924 was the first baby to be born on the Underground network.

Station upgrade and expansion

The interchange between the Bakerloo and Northern lines has long been criticised by local residents for its lack of escalators, its winding passageways and its two separate station entrances. Given the increased demand on the Underground station from proposed and under-construction residential development, Southwark Council has called for the expansion and redevelopment of the station, noting in 2008 that it was the "final hurdle" of a deal to redevelop the Shopping Centre. In 2018, the redevelopment of the Elephant and Castle Shopping Centre was approved, with a new station entrance as part of the proposal.

The upgrade and expansion work will include a new station entrance and ticket hall facing Elephant Square, three new escalators, and lifts providing step-free access to the Northern line platforms. The new entrance would also improve the interchange between the Underground and Elephant & Castle railway station, with a more direct route through the new development. The shell of the new ticket hall will be constructed by the developer Delancey; TfL and Southwark Council will share the £15m cost of connecting the shell to the existing platforms and to "fit out" the new ticket hall with escalators and lifts. The Shopping Centre closed in September 2020, allowing construction work to begin. The new ticket hall is scheduled to open in 2028/9.

The new ticket hall has been designed to accommodate the proposed Bakerloo line extension. New Bakerloo tunnels would be dug along with new platforms to accommodate the increase in demand if the Bakerloo line extension comes into service.{{cite web |url= https://consultations.tfl.gov.uk/tube/bakerloo-extension/user_uploads/background-to-consultation-report-updated.pdf

Proposals for the future

Bakerloo line extension to southeast London

Main article: Bakerloo line extension

An extension to Camberwell from Elephant & Castle was planned and approved in 1931. Elephant & Castle was also to be reconstructed with a third platform to provide the additional reversing capacity, along with a new ticket hall and escalators. Due to the need to prioritise the extension from Baker Street to Finchley Road, to relieve congestion on the Metropolitan line, as well as financial constraints and the outbreak of the Second World War, no work was carried out on the extension.{{refn|The 1931 enabling powers were renewed by the Government in 1947 under the Special Enactments (Extension of Time) Act, 1940, and the projected extension as far as Camberwell even appeared on a 1949 edition of the Underground map, but no further work was done.{{cite web |access-date=4 December 2015 |url-status=dead |archive-date=25 January 2008 |archive-url=https://web.archive.org/web/20080125074800/http://homepage.ntlworld.com/clive.billson/tubemaps/1949.html

During 2005–06, a Bakerloo extension was proposed with three route options. The options were extensions to Hayes via Peckham Rye, Beckenham Junction via Camberwell, or Hayes via New Cross. In July 2011, Network Rail recommended an extension of the Bakerloo line from Elephant & Castle to Lewisham, where it would take over the line to Hayes. In September 2014, Transport for London ran a consultation on the Bakerloo extension to Hayes and Beckenham Junction with options via Lewisham and Camberwell or Old Kent Road, taking over Network Rail's Hayes line. The cost of the extension is estimated at around £2–3 billion with construction expected to take place between the mid-2020s and early 2030s. A February 2017 consultation indicates that the line could extend to Lewisham via Old Kent Road with future extension options later on.{{cite web |access-date=23 May 2017 |archive-date=23 May 2017 |archive-url=https://web.archive.org/web/20170523114151/https://consultations.tfl.gov.uk/tube/bakerloo-extension/user_uploads/background-to-consultation-report-updated.pdf |url-status=live

References

  1. {{citation step free tube map
  2. {{citation Avoiding stairs Tube guide
  3. {{citation London station interchange January 2016
  4. {{cite map/Standard Tube Map
  5. Malvern, Jack. (3 January 2009). "Transports of delight: Girl born on the Tube". The Times.
  6. "Elephant & Castle tube station".
  7. Wright, Ian. (2 March 2013). "Elephant & Castle heritage information". [[Flickr]].
  8. David, Lew. "Elephant & Castle".
  9. (1925). "Elephant & Castle Underground Station". [[London Transport Museum]].
  10. (1914). "Elephant & Castle Underground Station (Ukn)". [[London Transport Museum]].
  11. (1934). "Elephant & Castle Underground Station (U41908)". [[London Transport Museum]].
  12. (12 December 2003). "Northern line ticket hall at Elephant & Castle reopens". [[London Underground]].
  13. Feather, Clive. (15 November 2014). "Vertical Transport". Clive's Underground Line Guides.
  14. "Tube Stations that have no escalators and use lifts to get down to the platforms". Geofftech.
  15. "Tube stations with steps". Geofftech.
  16. liam, victor. (15 May 2006). "Way Way Way Out". [[Flickr]].
  17. (22 July 2008). "Elephant & Castle Underground Station". bowroaduk.
  18. (16 May 2021). "Bakerloo Line Working Timetable 47". Transport for London.
  19. (13 May 2021). "As Govt restrictions ease further, TfL is ready to welcome back those returning to London". Transport for London.
  20. "Northern line timetable: Elephant & Castle to King’s Cross St Pancras". Transpoet for London.
  21. "Northern line timetable: Elephant & Castle to Kennington". Transport for London.
  22. (29 April 2023). "Buses from Elephant & Castle".
  23. (September 2021). "Night Buses from Elephant & Castle".
  24. {{London Gazette. (27 November 1883)
  25. {{London Gazette. (26 November 1886)
  26. {{London Gazette. (15 July 1887)
  27. {{London Gazette. (22 November 1889)
  28. {{London Gazette. (29 July 1890)
  29. Feather, Clive. (27 January 2015). "Northern line". Clive's Underground Line Guides.
  30. {{London Gazette. (24 November 1891)
  31. (25 August 1893)
  32. {{London Gazette. (25 November 1892)
  33. {{London Gazette. (22 November 1912)
  34. {{London Gazette. (22 November 1912)
  35. {{London Gazette. (14 February 1919)
  36. {{London Gazette. (20 November 1891)
  37. {{London Gazette. (11 August 1896)
  38. {{London Gazette. (7 August 1900)
  39. Lee, Charles E.. (March 1956). "Jubilee of the Bakerloo Railway – 1".
  40. (10 April 1902). "The Underground Electric Railways Company Of London (Limited)". [[The Times]].
  41. (17 February 1904). "Railway And Other Companies – Baker Street and Waterloo Railway". [[The Times]].
  42. Feather, Clive. (30 December 2014). "Bakerloo line". Clive's Underground Line Guides.
  43. Stephen Halliday. (2012). "Amazing & Extraordinary London Underground Facts". David & Charles.
  44. David Long. (2010). "Little Book of the London Underground". The History Press.
  45. (17 May 2011). "Who should pay for Elephant & Castle's new £160 million tube station?".
  46. (31 October 2008). "Elephant & Castle: tube station refurb cost is "final major hurdle" to regeneration deal".
  47. (11 December 2018). "Elephant and Castle shopping centre demolition gets final approval". BBC News.
  48. (14 October 2019). "Have your say on the Bakerloo line extension - Elephant & Castle Combined Station Entrance". Transport for London.
  49. (12 September 2018). "Further plans for Bakerloo line extension revealed following public consultation". Transport for London.
  50. (31 January 2020). "Council agrees additional funding for the first piece of infrastructure to deliver the Bakerloo Line Extension at Elephant and Castle". [[London Borough of Southwark]].
  51. Gayle, Damien. (24 September 2020). "'We're going to miss the community': Elephant and Castle shopping centre closes after 55 years". The Guardian.
  52. (9 October 2020). "New images of Elephant & Castle's upgraded tube station".
  53. (14 October 2019). "Transport for London consults on latest Bakerloo Line extension plans". Railway Gazette International.
  54. {{London Gazette. (17 March 1931)
  55. {{London Gazette. (9 October 1931)
  56. {{London Gazette. (12 December 1947)
  57. "Transport 2025: transport challenges for a growing city". [[Transport for London]].
  58. (27 August 2009). "Extending the Bakerloo: Investigations and Options". London Reconnections (blog).
  59. (July 2011). "London and South East Route Utilisation Strategy". Network Rail.
  60. Broadbent, Steve. (10 August 2011). "London RUS suggests fifth track on South West line". Rail.
  61. (4 January 2012). "London & South East RUS Summary of RUS recommendations and supporting information". Network Rail.
  62. (25 April 2012). "Integrated Transport – Bakerloo Line Extension". London Borough of Lewisham.
  63. (September 2014). "Bakerloo Line Extension". Transport for London.
  64. (September 2014). "Bakerloo Line Extension – Frequently Asked Questions". [[Transport for London]].
  65. Chandler, Mark. (1 December 2014). "Lewisham Council backs Bakerloo Line extension to borough". News Shopper.
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Elephant & Castle tube station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report